Traveled to the different branched of the Mount Baker school district to distribute and install UPS units in the server and switch rooms. Acme required two. We were also able to "clean up " some of the rooms by removing any unused patch cables or redundant power supplies.
Back on the main campus we were assigned to troubleshoot the schools digital clock system. It was no longer functioning and there didn't seem to be a known cause. After doing additional cleanup in the main server room, we found that there were some connection problems and some of power cables had not been reinstalled. An easy fix after a bit of fun with tracing cables and cords.